AWS DATA CENTRE
Stages 1 and 2 of the Amazon Web Services (AWS) SYD054 Orion Data Centre project, located in Smeaton Grange, NSW, This ambitious undertaking involves the meticulous construction of a two-storey, 48MW data centre across [...]
PALM RESIDENTIAL
IINGEN has been appointed by Neoscape and Summut Group to be the Building Services Consultancy responsible for the Design Development and Construction Stage across the following service: Electrical, Mechanical, Fire, Hydraulics, Digital/BIM and ESD [...]
MICROSOFT STATION ROAD DATA CENTRE
Currently progressing the construction of the first of the two datacentre buildings on site, with the construction estimated to be completed by July 2023. Completion of construction does not indicate datacenter operation/availability. [...]
SYDNEY OPERA HOUSE
Recent Win with Sydney Opera House for the full investigation, and Low Voltage Discrimination study assessment of Distribution Board Nodes strategic to maintain critical operation of the Sydney Opera House power infrastructure. [...]
JONES BAY WHARF
Located on the Pyrmont Point Peninsular, the multi award winning Jones Bay Wharf offers world class office space on Sydney's magnificent harbour. In 2003, these historic finger wharfs were sensitively restored to preserve their [...]
ST ABERDEEN SCHOOL, ST PIUS X SCHOOL, ST PATRICKS SCHOOL
The Three Catholic Schools with St Pius winning several Architectural and Building awards, IINGEN was involved in the electrical, specialist lighting and mechanical systems design and construction supervisions. St Pius Library is depicted in [...]